New Machine Installation

Our engineers will offer on-site installation or online guidance to ensure a smooth setup of your machine.

  1. Foundation

Our engineers will contact the client to prepare the installation site and foundation, ensuring they have base plates ready. The base plates will be secured to the concrete floor with expansion bolts. Once the machine is leveled, the adjustable feet will be welded to the base plates for stability. Ideally, a concrete column of 500×500×400 mm should be poured under the base plates. If the floor can support approximately 5 tons per square meter, the base plates can be directly fixed to the concrete.

  1. Installation

The machine will be placed on the foundation and leveled. The components that were disassembled prior to shipping will be reinstalled, including the mechanical parts, sheet metal parts, power cables, signal cables, laser, and water chiller.

  1. Commissioning

The equipment will be commissioned to check the functionality of all signals and ensure proper operation. The parameters for the client’s required materials—such as stainless steel, carbon steel, aluminum, and galvanized sheets—will be configured.

  1. Training
  1. Machine operation explanation
  2. Training on cutting software basics and operation
  3. Cutting adjustment training
  4. Supervision of client’s independent operation
  1. Acceptance

After the machine installation is confirmed, the client should sign and stamp the following documents: Laser Equipment Installation Acceptance, Training Procedure Record, Maintenance Confirmation, and Laser Equipment Safety Operation Procedures.

Leave a Reply

Your email address will not be published. Required fields are marked *

Get in Touch

We're here to help! Please fill out our inquiry form, and our team will respond promptly.

Please enter your claim